Bluetooth: Handle physical link completion

Several different actions may be taken when an AMP physical link
becomes available.  A channel being created on an AMP controller must
continue the connection process.  A channel being moved needs to
either send a move request or a move response.  A failed physical link
will revert to using a BR/EDR controller if possible.

Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
1 file changed