MIPS: Add support for fine granularity task level IRQ time accounting

With sched_clock being ready, it makes sense to add the option of IRQ time
accounting -- When we have a fast enough sched_clock, IRQ time accounting
will be enabled (see sched_clock_register).

Signed-off-by: Deng-Cheng Zhu <dengcheng.zhu@imgtec.com>
Cc: linux-mips@linux-mips.org
Cc: macro@linux-mips.org
Patchwork: https://patchwork.linux-mips.org/patch/9489/
Signed-off-by: Ralf Baechle <ralf@linux-mips.org>
1 file changed