sched: incremental effective_load()
Increase the accuracy of the effective_load values.
Not only consider the current increment (as per the attempted wakeup), but
also consider the delta between when we last adjusted the shares and the
current situation.
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Cc: Srivatsa Vaddagiri <vatsa@linux.vnet.ibm.com>
Cc: Mike Galbraith <efault@gmx.de>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
diff --git a/kernel/sched_fair.c b/kernel/sched_fair.c
index bed2f71..e87f1a5 100644
--- a/kernel/sched_fair.c
+++ b/kernel/sched_fair.c
@@ -1074,10 +1074,22 @@
static const struct sched_class fair_sched_class;
#ifdef CONFIG_FAIR_GROUP_SCHED
-static unsigned long effective_load(struct task_group *tg, int cpu,
- unsigned long wl, unsigned long wg)
+static long effective_load(struct task_group *tg, int cpu,
+ long wl, long wg)
{
struct sched_entity *se = tg->se[cpu];
+ long more_w;
+
+ if (!tg->parent)
+ return wl;
+
+ /*
+ * Instead of using this increment, also add the difference
+ * between when the shares were last updated and now.
+ */
+ more_w = se->my_q->load.weight - se->my_q->rq_weight;
+ wl += more_w;
+ wg += more_w;
for_each_sched_entity(se) {
#define D(n) (likely(n) ? (n) : 1)
@@ -1086,7 +1098,7 @@
S = se->my_q->tg->shares;
s = se->my_q->shares;
- rw = se->my_q->load.weight;
+ rw = se->my_q->rq_weight;
a = S*(rw + wl);
b = S*rw + s*wg;